Abstract
A major matter in any industry, especially one with complicated stakeholder relationships like the construction industry, is dispute resolution. Blockchain technology, in the form of crowdsourced arbitration, may assist project stakeholders to conclude a verdict for any conflict including an argument over delay damage responsibility. This paper aims to propose a Blockchain-based methodology to facilitate small and medium project delay resolution demands on a timely and transparent basis. The methodology consists of two implementation stages: (i) A Blockchain-powered crowdsourced arbitration jury to analyze and determine the responsible party and subsequent affairs following predefined conditions of the contract and (ii) Blockchain-based smart contracts to enable automatic implementation of said events including automatic payment of penalty and/or compensation cost. The introduced method is validated by a case study of crowdsourced arbitration using the Rhubarb plat-form to resolve disputes over who should be responsible for the delay of a garage construction project taken from an academic study on delay analysis techniques. The final verdict was that the contractor must reimburse the client’s financial loss following established terms and conditions on liquidated ascertained damages via smart contract operation. The research also underlines the pros and cons of both current decentralized dispute resolution practice and this research proposed model in the construction field for future studies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Science and Technology in Civil Engineering (JSTCE) - HUCE
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.