Abstract

Block replacement policy is a type of preventive replacement policies where the units are always replaced at failure or at a scheduled time periodically. Assuming that the lifetimes of the units are uncertain variables, this paper studies the block replacement policy in an uncertain environment. To deal with the different constraints a decision maker may face, three different criterions are used to build the optimization models for the uncertain block replacement problem, which are chance value, expected value and critical value. Based on these criterions, the uncertain block replacement models are transformed into some equivalent crisp models. Then the optimal scheduled replacement time under each criterion is obtained and its properties are investigated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call