Abstract

To control eutrophication in receiving water bodies, biological nutrient removal (BNR) of nitrogen and phosphorus has been widely used in wastewater treatment practice, both for the upgrade of existing wastewater treatment facilities and the design of new facilities. However, implementation of BNR activated sludge AS systems presents challenges attributable to the technical complexity of balancing influent chemical oxygen demand (COD) for both biological phosphorus (P) and nitrogen (N) removal. Sludge age and aerated/unaerated mass fractions are identified as key parameters for process optimization. Other key features of selected BNR process configurations are discussed. Emerging concerns about process sustainability and the reduction of carbon footprint are introducing additional challenges in that influent COD, N, and P are increasingly being seen as resources that should be recovered, not simply removed. Energy recovery through sludge digestion is one way of recovering energy from influent wastewater b...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.