Abstract

A lab-scale sequencing batch biofilm reactor (SBBR) was developed to treat domestic wastewater. After one year’s operation, the results were obtained as follows: when the reaction carried out in 3 h, COD removal efficiency approached or reached the maximal value, up to 90%. The nitrification process of NH3-N needed 4 h, and NH3-N removal efficiency reached the maximal value. Moreover, according to the variation of TN , NO3--N and NO2--N concentration in the nitrification and denitrification process, when NH3-N degraded to zero or the minimal value, just two cycles ending, it means that the SBBR system completed the nitrification and denitrification process.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call