Abstract
Bioclogging is the most crucial operation problem of the constructed wetlands, which reduce its removal efficiency and life span. A strategy through properly increasing hydraulic loading is proposed in this study to alleviate the bioclogging for CWs. The two-dimensional porous media flow cell (2D PMFC) test indicated that a quadratic correlation was found between local biofilms growth rate and the near-wall Reynolds number (r > 0.765, p < 0.05). The biofilm growth rate declined with the flowrate when Re exceeded about 6.0. It was also found that the higher flowrate (6mL/min) lead to the homogeneous biofilm and velocity distribution in the PMFC. The column test indicated that the highest hydraulic loading (9.2cm/h) produced the smallest decrease in hydraulic conductivity, which was 80 times more than that of low hydraulic load (3.0cm/h) at the end (40days) of experiment. Moreover, the relatively homogenized distribution of biofilm was found along the column with the highest hydraulic loading, which confirmed that the proper increase in hydraulic loading can alleviate bioclogging.
Submitted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.