Abstract

For optimization of timetables in metro systems with regular cyclic operation, this paper develops a bi-objective programming approach addressed to minimization of net energy consumption and total travel time with provision for dwell time uncertainty. Firstly, we formulate the bi-objective timetable optimization problem as an expected value model with speed profile control. Secondly, we use the ɛ-constraint method within a genetic algorithm framework to determine the Pareto optimal solutions. Finally, numerical examples based on the real-life operation data from the Beijing Metro Yizhuang Line are presented in order to illustrate the practicability and effectiveness of the approach developed in the paper.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call