Abstract

In the literature of multi-objective problem, there are different algorithms to solve different optimization problems. This paper presents a min–max multi-objective procedure for a dual-objective, namely make span, and sum of the earliness and tardiness of jobs in due window machine scheduling problems, simultaneously. In formulation of min–max method when this method is combined with the weighting method, the decision maker can have the flexibility of mixed use of weights and distance parameter to yield a set of Pareto-efficient solutions. This research extends the new hybrid metaheuristic (HMH) to solve parallel machines scheduling problems with sequence-dependent setup time that comprises three components: an initial population generation method based on an ant colony optimization (ACO), a simulated annealing (SA) as an evolutionary algorithm employs certain probability to avoid becoming trapped in a local optimum, and a variable neighborhood search (VNS) which involves three local search procedures to improve the population. In addition, two VNS-based HMHs, which are a combination of two methods, SA/VNS and ACO/VNS, are also proposed to solve the addressed scheduling problems. A design of experiments approach is employed to calibrate the parameters. The non-dominated sets obtained from HMH and two best existing bi-criteria scheduling algorithms are compared in terms of various indices and the computational results show that the proposed algorithm is capable of producing a number of high-quality Pareto optimal scheduling plans. Aside, an extensive computational experience is carried out to analyze the different parameters of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call