Abstract

PurposeThe paper aims at the bi‐objective optimization of a two‐echelon distribution network model for facility location and capacity allocation where in a set of customer locations with demands and a set of candidate facility locations will be known in advance. The problem is to find the locations of the facilities and the shipment pattern between the facilities and the distribution centers (DCs) to minimize the combined facility location and shipment costs subject to a requirement that maximum customer demands be met.Design/methodology/approachTo optimize the two objectives simultaneously, the location and distribution two‐echelon network model is mathematically represented in this paper considering the associated constraints, capacity, production and shipment costs and solved using hybrid multi‐objective particle swarm optimization (MOPSO) algorithm.FindingsThis paper shows that the heuristic based hybrid MOPSO algorithm can be used as an optimizer for characterizing the Pareto optimal front by computing well‐distributed non‐dominated solutions. These aolutions represent trade‐off solutions out of which an appropriate solution can be chosen according to industrial requirement.Originality/valueVery few applications of hybrid MOPSO are mentioned in literature in the area of supply chain management. This paper addresses one of such applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.