Abstract

Construction work in its implementation is carried out based on a contract. If there are problems in carrying out construction work, a dispute between the parties, in this case the service user and the service provider, will occur. Indonesia Law No. 2/2017 about Construction Services (hereafter called UU 2/2017) provides a new dispute resolution model option if problems occur in the construction sector, namely through the Dispute Board. The Dispute Board was created by the International Federation of Consulting Engineers / Federation Internationale des Ingenieurs-Conseils or FIDIC which was adopted into UU 2/2017. However, the regulation regarding the Dispute Board in UU 2/2017 needs to be studied further, especially regarding the nature of the final binding decision, because it still raises problems in its implementation. The purpose of this study is to examine the development of dispute resolution in the field of construction and the implementation of the final and binding nature of dispute board decisions. This study employed legal research methods with a conceptual and statute approach. The results of this study found that construction disputes can be resolved through litigation or non-litigation. The presence of the Dispute Board still does not provide legal certainty for the parties because the nature of the decision is final and binding but is not supported by an implementation mechanism.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.