Abstract
This study discuss 24-hours load scheduling to get the minimum generation cost. Fuel cost in load scheduling need to be considered, because fuel and power suppliers are bound by take or pay schedule. In addition load scheduling considering heat rate, start-up cost, minimum up time and minimum down time. Load scheduling calculate by priority list method that is completed using artificial intelligence, Binary Particle Swarm Optimization (BPSO). The data used in this study is IEEE 30 bus and Java-Bali 500 kV.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.