Abstract
This research presents a transformative framework to tackle challenges within the construction industry, where efficiency is hindered by limited digitalization and disjointed project phases. The framework seamlessly integrates state-of-the-art technologies, such as Building Information Modeling (BIM), Genetic Algorithms (GAs) for schedule optimization, 5D simulation, and a Business Intelligence (BI) Dashboard. By doing so, it effectively enhances productivity while bridging the gap between the realms of management and engineering. A comprehensive literature review underpins the framework's design, focusing mainly on BIM-based schedule generation and optimization. The approach's validity is demonstrated through a compelling case study, showcasing automated BIM model creation, BIM-Based schedule generation limited to structural elements of bottom-up Cast-in-situ construction method, GAs-driven schedule optimization, 5D project simulation, and the integration of the BI dashboard. This research propels operational efficiency and promotes harmonious integration with pre-existing software systems, thus facilitating smoother adoption and adaptation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.