Abstract

In order to achieve the sustainable growth of its urbanization and natural resources, China has been making great efforts to develop prefabricated construction technologies. However, the high incremental cost of prefabricated buildings (PRBs) is a fundamental obstacle to the latter. The current study mainly focuses on analyzing the incremental cost of the on-site construction stage. It is hard to comprehensively identify the incremental cost composition without considering the incremental cost caused by prefabricated components (PFCs) production. Moreover, the results of incremental cost calculation are not accurate enough by comparing the cost of two similar but different PRB and traditional buildings (TRB), and the case-based calculation results suffer from a lack of representation. To address these issues, we first establish a two-dimensional incremental cost index system from the dimension of cost items and prefabricated technologies to study the incremental cost composition of the whole construction stage. Additionally, based on China’s latest policies documents, the applicability of incremental cost composition items can also be improved. Then a building information modeling (BIM)-based calculation model is presented to avoid the calculation error caused by comparing the cost of two different PRBs and TRBs. To validate the proposed index system and calculation method, an actual prefabricated project in China is also conducted as a case study. The results suggest that: (1) Incremental cost is composed of band bearing and retaining walls and inner walls PFCs production, PFCs hoisting and grouting, post-pouring concrete, and full decoration. (2) The BIM-based incremental calculation result of a PRB case from Shanghai is within the range of the national average PRB incremental estimation results. The incremental cost composition items and BIM-based calculation approach can greatly help investors to identify the largest increase in cost and make effective cost optimization strategies.

Highlights

  • In recent years, the development of population urbanization in China has been booming

  • (2) The building information modeling (BIM)-based incremental calculation result of a prefabricated buildings (PRBs) case from Shanghai is within the range of the national average PRB incremental estimation results

  • The incremental cost composition items and BIM-based calculation approach can greatly help investors to identify the largest increase in cost and make effective cost optimization strategies

Read more

Summary

Introduction

The development of population urbanization in China has been booming. This speeding process of urbanization is undoubtedly associated with higher demand for the improvement of housing conditions and the living environment. By 2020, China’s population is expected to reach up to 1.42 billion, and the urbanization rate will increase tremendously from 58.47% to 60.02%, as predicted by the National Health Commission of the People’s Republic of China [1,2]. The current construction industry in China cannot meet the fast growing demand for urban housing. In order to realize the sustainable development of urbanization and natural resources in China, there is an urgent need for the construction industry to be reformed with more innovative technologies. Prefabricated construction technology has been introduced and implemented to mitigate these challenges [5,6]

Objectives
Methods
Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call