Abstract

Engineering cost budgeting is crucial to the healthy development of the engineering and construction industry. To solve the problem of large deviations in budget results from using traditional methods of cost budgeting based on evaluation results or drawing conversions, the BIM engineering cost budgeting method based on social network analysis method is studied in this paper. On the basis of analyzing cost budgeting requirements and determining modeling economic criteria, the social network analysis method is used to analyze the project cost risks. According to the project quantity list, professional BIM software is used to budget the project cost. Case verification proves the feasibility of this budgeting method as the budget deviation is reduced by about 78% compared with the traditional method. The result of the paper has a more ideal practical application effect and positive significance for optimizing the traditional cost budgeting methods

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call