Fast transmission of COVID-19 led to mass cancelling of events to contain the virus outbreak. Amid lockdown restrictions, a vast number of construction projects came to a halt. Robotic platforms can perform construction projects in an unmanned manner, thus ensuring the essential construction tasks are not suspended during the pandemic. This research developed a BIM-based prototype, including a task planning algorithm and a motion planning algorithm, to assist in the robotic assembly of COVID-19 hospitalisation light weight structures with prefabricated components. The task planning algorithm can determine the assembly sequence and coordinates for various types of prefabricated components. The motion planning algorithm can generate robots' kinematic parameters for performing the assembly of the prefabricated components. Testing of the prototype finds that it has satisfactory performance in terms of 1) the reasonableness of assembly sequence determined, 2) reachability for the assembly coordinates of prefabricated components, and 3) capability to avoid obstacles.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.