Abstract

Although construction site layout planning (CSLP) is a significant step in construction planning that has a direct impact on the project performance, its input parameters are mainly obtained by asking site managers and related contractors. The dynamic environment, complexities, and uncertainties of a construction project cause a reduction in the precision of these inputs. This study aims to enhance the CSLP precision by providing a holistic and practical method for estimating these parameters. For this intention, a database is established using the data obtained from the project schedule and BIM to allow the calculation of the input parameters. A new algorithm for facility setup is also proposed for optimizing the facility's shape, which seems beneficial in congested sites where space becomes a limited resource. A case study demonstrates the practicality and functionality of the method. The facility setup algorithm also causes an improvement over restricting facilities to regular shapes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call