Abstract

It is most effective to apply CPTED in the architectural design stage. On the other hand, the use of BIM is increasing in the construction field. BIM is used for information linkage and performance analysis simulation by building life-cycle. In particular, BIM-based legality review can be conducted at Construction Consult. In line with these changes in the architectural field, it is necessary to conduct research to use BIM in the CPTED field. It will be possible to supplement various limitations that have appeared in the application of CPTED for each building life-cycle stage. Therefore, in this study, the legal system for applying BIM and CPTED in the Construction Consent stage is considered. Next, this study examines BIM-related studies that appeared in 1) the architectural design stage, 2) the architectural construction consultation stage, and 3) the CPTED design certification stage. The purpose of this is to derive future research directions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.