Abstract
Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed sections after parsing existing problems using Fishbone diagrams.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Industrial Engineering and Halal Industries
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.