Abstract

We study the problem of scheduling on k identical machines a set of parallel tasks with release dates and deadlines in order to maximize simultaneously two criteria, namely the Size (number of scheduled tasks) and the Weight (sum of the weights of scheduled tasks). If no task requires more than half of the machines, we construct schedules that are simultaneously approximations for the Size and the Weight by combining two approximate schedules, one for each parameter. We obtain existence results and polynomial time bicriteria approximation algorithms in contiguous and non contiguous models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.