Abstract

This paper deals with the joint production and maintenance scheduling problem according to a new bi-objective approach. This method allows the decision maker to find compromise solutions between the production objectives and maintenance ones. Reliability models are used to take into account the maintenance aspect of the problem. The aim is to simultaneously optimize two criteria: the minimization of the makespan for the production part and the minimization of the system unavailability for the maintenance side. Two decisions are taken at the same time: finding the best assignment of n jobs to m machines in order to minimize the makespan and deciding when to carry out the preventive maintenance actions in order to minimize the system unavailability. The maintenance actions numbers as well as the maintenance intervals are not fixed in advance. Two evolutionary genetic algorithms are compared to find an approximation of the Pareto-optimal front in the parallel machine case. On a large number of test instances (more than 5000), the obtained results are promising.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.