Abstract

In this paper, we consider the online single machine scheduling problem to minimize the maximum weighted completion time of the jobs. For the preemptive problem, we show that the LW (Largest Weight first) rule yields an optimal schedule. For the non-preemptive problem, Li [Li, W (2015). A best possible online algorithm for the parallel-machine scheduling to minimize the maximum weighted completion time. Asia-Pacific Journal of Operational Research, 32(4), 1550030 (10 pages)] presented a lower bound 2, and then provided an online algorithm with a competitive ratio of 3. In this paper, we present two online algorithms with the best-possible competitive ratio of [Formula: see text] for the non-preemptive problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call