Bangladesh is a country of potentialities. Power plays a vital role in the economic development of the country. So the economic development is not possible without power development. No exclusive research work has been so far study. Hope that the country will be benefited with its development. Uninterrupted, safe and adequate power supply is a pre- requisite for the development of the country. Presently, to overcome the capacity limitations of generation, transmission and distribution sector, different programs have been taken. To address these issues, Tongi 80 MW Gas Turbine Power Station has been installed. This power station will not only play an important role to meet the demand but it will also contribute significantly in reducing overloading of Tongi Grid sub station, low voltage problem of the adjacent areas, technical losses of the system and will ensure quality power supply in the capital city.

Highlights

  • Electricity has played a pivotal role for the socio economic development of the country

  • The Tongi 80 MW Gas Turbine Power Station play an important role in this regard especially in reducing the overloads of the Tongi Grid sub station, This study was to design to come up with relevant information and data

  • Turnkey project is a project in which a builder/developer contracts to construct a completed facility that includes all items necessary for use

Read more

Summary

METHODOLOGY OF THE STUDY

Electricity has played a pivotal role for the socio economic development of the country. The Tongi 80 MW Gas Turbine Power Station play an important role in this regard especially in reducing the overloads of the Tongi Grid sub station, This study was to design to come up with relevant information and data. A turnkey project is capital construction projects in which the supplier (contractor) designs and builds the physical plant, trains the local personnel on how to manage and operate the facility and presents the buyer with a self-sustaining project. A turn key project is a construction project wherein the contractor agrees to design and build a plant. A turnkey project provides a deliverable to the customer that is fully tested and ready to use upon delivery This can be a tremendous advantage to the customer since it eliminates the need for the customer to manage the project.

CHARACTERISTICS OF TURNKEY PROJECT
DEFINITION OF PROJECT
Findings
CONCLUSION