Abstract
One possible approach for the determination of new maintenance inspection schedules in the case of operational load monitoring is presented. Emphasis is laid on fatigue critical structural items. The method is based on the assumption that required safety factors may be reduced, if the actual load history is known from individual monitoring. As an example the method has been applied to an existing widebody aircraft type.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have