Abstract

Design coordination of mechanical, electrical, and plumbing (MEP) systems in buildings is a multidisciplinary effort to locate equipment, route distribution systems, and resolve interferences between systems that can cause field conflicts. Absent from existing research are defined metrics of design coordination—how much it costs to perform depending on project variables, and the true costs of field conflicts that are eliminated by coordination. This research was performed to explore the costs of design coordination in concert with the benefits of eliminating coordination conflicts that arise in the field. A standard method to measure costs of coordination is developed for case study projects. Potential variables that affect this cost are evaluated, and the negative impacts of field conflicts are measured. Project variables that have strong relationships with coordination costs are identified to be MEP density [MEP cost/square foot (SF)], and plenum height, and exploratory models to predict coordination co...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.