Abstract

Correct prediction of water hammer transients is of paramount importance for the safe operation of the plant. Therefore, verification of computer codes capability to simulate water hammer type transients is a very important issue at performing safety analyses for nuclear power plants. Verification of RELAP5/MOD3.3 code capability to simulate water hammer type transients employing the experimental investigations is presented. Experience gained from benchmarking analyses has been used at development of the detail RELAP5 code RBMK-1500 model for simulation of water hammer effects in reactor main circulation circuit. In RBMK-type reactors the water hammers can occur in cases of rapid check valve operation. The performed analysis using RELAP5 code RBMK-1500 model has shown that in general the maximum values of the pressure pulses due to water hammer do not exceed the permissible loads on the pipelines.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call