Abstract

The report provides an assessment of the route for the SNF Fuel transport system from the K Basins to the CVDF and to the CSB. Results include the identification of any underground structures or utilities traveled over by the transport, the overburden depths for all locations identified, evaluation of the loading conditions, and determination of the effects of the loads on the structures and utilities.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call