Abstract

The paper discusses the behavioural analysis for a shell gasification and carbon recovery process in a urea fertilizer plant. The system consists of three subsystems D, E and F arranged in series, with three possible states—good, reduced and failed. The subsystem D has three parallel operating units with two units in cold standby. Failure and repair rates for each subsystem are taken as constant. Formulation of the problem is carried out using simple probability consideration. An expression for steady-state availability is derived. Taking data from a medium sized plant, the effect of each working unit on the system availability is tabulated. The results are supplied to the plant personnel for improvement in designing the system and planning the process for minimum failure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.