Abstract

Based on the elastic thin plate theory, the main law of the ore roof failure was analyzed and the formula of the ore roof thickness was deduced. The results show that the tensile stress in the roof center accounts for the roof failure. According to the limit failure conditions of the point, the formula of the ore roof thickness was derived. Taking No.10 stope of a bauxite mine as an engineering case, the optimal thickness of the ore roof was 0.36 m. The safety factor was taken as 1.3, therefore the design thickness was 0.5 m. In the whole industrial test process, the dynamic alarm devices did not start the alarm and the ore roof was not damaged. Compared with other stopes under similar conditions, its thickness was reduced by 0.1−0.3 m. The recovery rate of the ore roof was increased by 16.7%−37.5%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.