Abstract

In the course of operation or armed hostilities the span r.c. structures are subject to substantial damage and considerable reduction of their bearing capacity, especially under low-cycle repeated loading. In this connection it becomes necessary to renew their operation capacity and/or improve their bearing capacity. However, the current design standards contain no recommendations as to determination of the residual bearing capacity of such structures and calculation of their reinforcement. There are methods of the operation capacity renewal and reinforcement of the structures by increasing their sections adding metal or reinforced concrete elements. Still, the calculation methods of such reinforcement are also imperfect. It is proposed to renew operation capacity of such structures by strengthening their tensioned parts with CFRP; the performed experimental research will provide the basis for calculating bearing capacity of said structures with the aid of the deformation method improved by the authors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.