Abstract

This paper examines the procedures developed and employed by BEAR Scotland Limited to efficiently deal with geotechnical emergencies on the trunk road network in NW Scotland, and specifically how BEAR can call upon expert geotechnical consultancy and construction services to promptly resolve failures which impact on road infrastructure. The paper considers two case studies involving the failure of a significant embankment on the A9 and a natural terrain hazard (landslide/debris flow) failure affecting the A83, and how BEAR's approach allowed these geotechnical emergencies to be dealt with in an efficient manner.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.