Abstract
About 90 stripline-type beam position monitors (BPMs) have been newly installed in the KEKB injector linac. These monitors easily reinforce handling beam orbits and measuring the charge of single-bunch electrons and positrons which are injected to the KEKB rings. The design value of the beam position resolution is expected to be less than 0.1 mm. A new data-acquisition (DAQ) system has been developed in order to control these monitors in real time. The hardware and software of 18 front-end computers were tuned for the linac commissioning. This report describes the hardware and software system, the monitor calibration, and preliminary beam test results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.