Abstract

Based on simulated LHC beam loss scenarios, fully depleted CMS silicon tracker modules and sensors were exposed to 42 ns -long beam spills of approximately 10 11 protons per spill at the PS at CERN. The ionisation dose was sufficient to short circuit the silicon sensors. The dynamic behaviour of bias voltage, leakage currents and voltages over coupling capacitors were monitored during the impact. Results of pre- and post-qualification as well as the dynamic behaviour are shown.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.