Abstract

The China Spallation Neutron Source(CSNS) accelera-tor systems is designed to deliver a 1.6GeV, 100kW pro-ton beam to a solid metal target for neutron scattering research. It consists of a 50keV H⁻ Ion Source, a 3MeV Radio Frequency Quadrupole (RFQ), an 80MeV Drift Tube Linac (DTL), and a 1.6GeV Rapid-cycling Synchro-tron (RCS). The DTL consists of four tanks. In 2017, three of four tanks have been commissioned successfully, and beam has been accelerated to 61MeV with nearly 100% transmission. However, in July 2017, one quadrupole contained in the drift tube was found fault, the beam transmission decreased to 80%. A new lattice has been designed and the 100% transmission has recovered. In January 2018, the last tank of the DTL has been commissioned and accelerated the H⁻ beam to the design energy of 80MeV for the first time. The commissioning progress and the measurement results before and after lattice adjustment will be presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call