Abstract

A proton–proton collider at center-of-mass energy of more than 70 TeV is the second stage of the CEPC-SPPC program. As proposed, the SPPC injector chain will use a 1.2 GeV p-Linac and three synchrotrons of 10 GeV p-RCS, 180 GeV MSS and 2.1 TeV SS. Peking University is responsible for the preliminary conceptual design of the room temperature part of SPPC p-Linac. This paper is focusing on the beam dynamics studies performed with respect to the 325 MHz RFQ. As the first accelerator structure after the ion source and the front-end of the whole SPPC, RFQ plays an important role in the beam initial transverse focusing and longitudinal bunching. Based on the New Four Section Procedure strategy, as well as the matched and Equipartitioning design method, a 3 MeV RFQ designed by Parmteq code will be introduced. The cavity length of RFQ is 3.6 m and the transmission efficiency is 98%. In this design scheme, the 40 mA proton beam from the 50 keV ion source is accelerated to 3 MeV in 3.8 m length, which achieves a sixty times energy gain. The results of the analyses show that the RFQ design is reliable and meets all the SPPC p-Linac requirements well.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call