Abstract

Industrial systems often have redundant structures for improving reliability and avoiding sudden failures, and a parallel system is one of the special redundant systems. In this paper, we consider the problem of reliability estimation for a parallel system when one stress variable is involved, which is called the multicomponent stress-strength model. The parallel system contains two components, and their joint lifetime follows a Marshall–Olkin bivariate Weibull distribution, while the stress variable is assumed to be the Weibull distribution. Due to the complicated form of the likelihood function, a data augmentation method is proposed, and then the Gibbs sampling algorithm is constructed to obtain the Bayesian estimation of the system reliability. The proposed method is evaluated by a simulated dataset and Monte Carlo simulation study. The simulation results show that the proposed method performs well in terms of relative bias, mean squared error and frequentist coverage probability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.