Abstract

The design assessment of airborne power system can be started from designing stage of the power system. It can analyse and evaluate the status of the power system. The key to the designation of evaluation system is how to evaluate the performance of the power system. With airborne power system as the research object, combined with military standard GJB181A - 2003,and through the onboard power system for co-test, it can establish a set of objective assessment strategies and methods can achieve comprehensive evaluation on the performance of airborne state of power system. Based on bayesian theory evaluation method. With 28 v low voltage dc onboard power system as an example, intercepting the multiple sets of test and analysis data to evaluate instances test and comparative analysis of the model, a comprehensive evaluation and the rationality of the evaluation result is verified by relevant experimental data.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.