Abstract

We consider a situation in which the manufacturing system is equipped with batch and discrete processors. Each batch processor can process a batch (limited number) of jobs simultaneously. Once the process begins, no job can be released from the batch processor until the entire batch is processed. In this paper, we analyze a class of two-machine batching and scheduling problems in which the batch processor plays an important role. Specifically, we consider two performance measures: the makespan and the sum of job completion times. We analyze the complexity of this class of problems, present polynomial procedures for some problems, propose a heuristic, and establish an upper bound on the worst case performance ratio of the heuristic for the NP-complete problem. In addition, we extend our analysis to the case of multiple families and to the case of three-machine batching.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.