Abstract

This paper studies the batch scheduling problem in a supply chain from the supplier’s point of view. The supplier has to manufacture multiple products in large quantities and deliver them to customers in batches. There is an associated delivery cost with each delivered batch. The objective of the supplier is to minimize the inventory holding and delivery costs. The supplier’s system is modeled as a one-stage system in which processing a batch requires a setup when the system switches to a different product. A polynomial-time algorithm is presented to minimize the sum of the total inventory holding cost and the batch delivery cost of the supplier.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.