Abstract

A novel multiple-objective model for batch scheduling of an energy-intensive manufacturing process, e.g., heat treatment, is proposed. The model minimizes energy consumption and total weighted tardiness while considering the arrival times of each workpiece and the inherent uncertainties in gas heating values, processing times, and due dates. Fuzzy logic is adopted to characterize these uncertainties and to interpret objective dominance when finding a Pareto frontier. A non-dominated sorting genetic algorithm is employed. The approach is demonstrated using a pre-treatment (soaking) process prior to a hot rolling operation. Pareto optimal performance of the model under different parameter settings is discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.