Abstract

The paper addresses the problem of including aspects of uncertainty in process parameters and product demands at the design stage of multiproduct/multipurpose batch plants. A conceptual two-stage stochastic programming formulation is proposed with an objective function comprising investment costs, expected revenues from product sales, and a penalty term accounting for expected losses due to unfilled orders. It is shown that (i) the proposed formulation captures the various decision-making policies toward demand satisfaction in a unified way, (ii) the employed feasibility criterion for the incorporation of the uncertainty enables the exact reformulation of the two-stage model as a single large-scale optimization model, (iii) for the case of discrete equipment sizes and despite the use of general continuous probability distribution functions to describe the uncertainty, linearity of the model is preserved, allowing detailed scheduling models to be included directly in the optimization model, and (iv) for th...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.