Abstract
Given that the lower third of a pyramid contains about 70% of the stone blocks, the only efficient way of reducing building time at the minimum is a method which allows for upward transport of material from all four sides simultaneously. Ramps positioned tangentially with a slope of 26° come to mind. The time required for upward transport of blocks significantly influences the total building time. By comparison, the production of blocks in the quarry as well as their transport to the building site and horizontal transfer on the respective level would have been far less challenging as more workforce would have been available. In the model presented here, upward pulling of blocks on horizontal rollers is accom- plished by letting workers move downwards on the other side of the ramp. After completion of the stepped core, the ramps are removed, and the casing, which consists of horizontal courses, is laid. For this, a stepped auxiliary platform and tangential ramps are used. Thus, it is possible to set the pyramidion and subsequently polish the exterior face top down without significant danger, while also removing the auxiliary platform.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.