Abstract

More and more transmission power cable circuits with lengths up to several tens of kilometers will be installed and put into operation. This contribution discusses basic aspects of selecting an on-site test voltage and the partial discharge measurement under on-site testing conditions of power cable lines with long length. On the one side, the generation of suitable test voltages for high capacitive loads, especially long cables, is evaluated and experiences of on-site measurements are described. On the other hand, the challenges for sensitive partial discharge measurement on long length power cables are discussed. Under this scope, partial discharge measurement by dual-sided measurement technique is described and examples are shown.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.