Abstract

This paper proposes that based on the EMD and PSO-BP neural network of short-term load forecasting. This method will be automatically historical load sequence into several independent intrinsic mode functions (IMF) by using EMD. As the BP neural network training for a long time and easy to fall into local minimum of the shortcomings, we use genetic algorithm to optimize BP neural network algorithm replaces the traditional BP algorithm. Finally, we use the BP neural network optimized separately for each IMF component for training and prediction. We should add the component to the final prediction forecast. This method has higher precision than the EMD-BP model prediction by Simulation results show.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.