Abstract

This report addresses the technical progress for the Basalt Waste Isolation Project for the second quarter of fiscal year 1980. Seismic design values were developed for preliminary repository design purposes; 0.25 g horizontal and 0.125 g vertical maximum accelerations for surface, zero-period conditions. Preliminary seismic data indicate broad, smooth areas exist in the bedrock surface in the western portion of the Cold Creek syncline and a gently undulating bedrock surface in the eastern portion. Test results indicate hydraulic property values fall within the range previously reported for sedimentary and interflow zones in basalt formations at the Hanford Site. Preliminary results of available hydrochemical data obtained from several borehole sites indicate that little, if any, vertical mixing of groundwaters is taking place across this stratigraphic boundary. Multiple barrier studies indicate that the primary candidate canister/overpack alloys are TiCode-12, Inconel 625, Incoloy 825, and Zircaloy 2. Low-carbon steel and cast iron are among the list of secondary candidate canister alloys. Laboratory tests of borehole plug designs have shown that it is feasible to design a composite plug system that will satisfactorily seal a nuclear waste repository in Columbia River basalt. The National Lead Industries, Inc., NLI-1/2 Universal Spent Fuel Shipping Cask wasmore » selected for use in Phase II operations. Creep test results of samples of Umtanum basalt from borehole DC-6 were plotted and show the day-to-day variation in deformation versus time. The concept selection phase of repository conceptual design was completed in March 1980. A test plan for the Exploratory Shaft Test Facility was developed and is scheduled for submittal to the US Department of Energy in May 1980.« less

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call