Abstract

The San Francisco Bay Area Rapid Transit System is the first completely new full-scale urban mass transportation system to be completed in the United States in approximately 70 yr. As such, it offered engineers an unusual opportunity to develop new technology in vehicle performance, use of electronics for automatic train controls and fare collection, esthetics, multiple use of transportation corridors, passenger station design, subway construction, and other aspects of rapid transit planning and construction. These features are described in this article, along with “start-up” problems encountered, early patronage, and the significance of the system to the economic well-being of the Bay Area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.