Bangladesh’s railway infrastructure is outdated and inadequate, and the lack of transportation capacity seriously hinders the country’s economic development. In the track engineering practice of EPC projects such as the second line project of a railway Meter-Gauge addition project and the new Board-Gauge railway project in Bangladesh, according to the operation characteristics and maintenance status of the existing cable of the Bangladesh railway, the design and construction characteristics of the railway track, and the procurement of track materials, combined with the characteristics of the EPC project management in the country, suggestions on the general contracting and construction of track engineering were put forward. He also analyzed and summarized the risk factors in the design and construction of Bangladesh railway track engineering, and made some useful thoughts and explorations on how to do a good job in the general contracting of track engineering of EPC projects according to local conditions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call