Abstract
This paper describes the investigations undertaken at Balgray Reservoir after concerns were raised regarding the condition of the heavily encrusted original cast-iron pipework, which dates from 1853. Testing of the thickness and hardness of a section of the pipe as well as testing of the encrustation was used to determine the materials present. The results of these investigations were used to determine the implications for the condition of the pipe and the resulting risks posed to the dam. This informed the potential options for the required remediation works. Details are provided for the case study, the investigations and findings, and potential options for encrustation removal.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.