Abstract

AbstractAs a well‐developed optimization problem, the knapsack problem has been broadly applied in various fields involving resource allocations, especially production planning. In this paper, we propose a target‐based distributionally robust knapsack problem (TDRKP), considering both uncertain profit and capacity, as well as the impact of a given target for profit. Based on a shortfall risk measure and piecewise utility function, the violation risk of the target is investigated. To solve the model efficiently, TDRKP is reformulated into computationally tractable form as a second‐order conic program. Through a series of numerical experiments, we verify that the proposed TDRKP formulation performs better than both the sample average approximation model and the minimizing violation probabilities model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.