Abstract

The basic assumption of assembly line balancing is that every task's time is fixed. However, in practice, different processing alternatives may be available to process a task with different times. The problem in this case is to assign tasks and resources to work stations that minimise total cost and so-called resource dependent assembly line balancing (RDALB) in the literature. This study proposes a new integer programming formulation for RDALB. This formulation is then modified to develop a formulation for RDULB problem in U-shaped assembly lines. To the best knowledge of the authors, this study is the first RDULB study and the developed formulation is the first RDULB formulation. The proposed formulations are illustrated and validated using several examples. An experimental analysis is also conducted to examine the percent improvement in total cost when the line layout is switched into the U-shaped from the straight line shape. Experimental results show that an improvement in total operating cost is obtained when the straight line is switched into the U-shaped line configuration. Results also show that percentage improvement in total operating cost is significantly greater for problem instances having a large number of tasks and having greater values for the strength of the precedence relationships among tasks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.