Abstract
ABSTRACT In the literature, line balancing is mostly investigated in deterministic environments. But production systems inevitably contain stochastic situations. In this study, the stochastic type-II assembly line balancing problem (ALBP) is considered. Firstly, a chance-constrained nonlinear mixed integer programming (MIP) formulation is developed from the well-known deterministic form. Then, a new linearized stochastic model is proposed by using some transformation approaches to reduce model complexity, and the model is solved. Finally, constraint programming (CP) models for deterministic ALBPs, nonlinear chance-constrained stochastic ALBPs and linearized chance-constrained stochastic ALBPs are developed, respectively. Problems from the literature are utilized to test the effectiveness of the proposed models and the results are compared with a bidirectional heuristic algorithm. The numerical results show that the CP models are more effective and successful for solving the stochastic ALBP. Some managerial implications are also suggested for industrial environments that consistently face ALBPs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.