Abstract
In a two-sided assembly line, tasks can be executed simultaneously on both sides of the line. One task cannot be started until both of its direct predecessors on the left and right sides are completed. Therefore, the start time of the task is the maximum of the two predecessors’ finish times. In many realistic situations, it is assumed that the task times are independent and normally distributed with known means and variances. However, the maximum of two normal variables is not normally distributed, but can be well approximated by results from extreme value theory. In this paper, we utilise these results to develop a solution methodology to balance two-sided assembly lines with stochastic task times, minimising the line length and the number of stations while guaranteeing all tasks are completed within the cycle time with a given confidence level.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.